South Boulder Road at 120th Street Colorado

Centered around a new multi-use path and reconstructed parking space, the City of Lafayette sought to make multi-modal improvements along South Boulder Road from Malory Street to 120th Street and on 120th Street from Eastwind Drive to Coal Creek. The Otak construction management & inspection team would keep the project to specifications and on-schedule.

Efficient Construction of Multi-Modal Improvements

Working with the Boulder County Transportation Department and the Colorado Department of Transportation, South Boulder Road would be widened with two thru-lanes; a center turn lanes; and bike lanes. The 10-foot wide concrete multi-use path runs along Merlin Drive from South Boulder Road up to the Alicia Sanchez Elementary School, and along Front Range Drive from South Boulder Road to the Lafayette Park-n-Ride. The path is accompanied by at 6-foot wide sidewalk as well as the reconstruction of the Lamont parking lot that expands parking space while also adding additional green space. A new signalized intersection at South Boulder Road and 120th Street aimed to improve traffic with turn lanes on the north, south and west legs and a dual left-turn lane for traffic traveling eastbound on South Boulder Road and turning left onto 120th Street. An existing ditch alongside 120th Street would be piped and a new storm sewer installed.

Want to talk projects? Contact our team leads.

“Problem solving and tangible results that can improve people’s lives make this my ideal line of work.”

Mike Williams

Manager of Construction Management & Inspection, Oregon & SW Washington